Energy Monitoring & Management

Multispan Demand Controller

Share This Product :

A maximum demand controller monitors the rolling demand against the contracted limit and sheds pre-assigned loads before the limit is exceeded.

The economics are specific to how demand is billed. On most industrial tariffs the maximum demand charge is set by a single half-hour interval in the whole month — one unlucky coincidence of loads starting together can raise the bill for the entire billing period, and often for months afterwards where a ratchet clause applies. A demand controller exists to prevent that single interval.

What to specify

  • Contracted maximum demand and the utility integration period
  • Number of load-shed stages required and their priority order
  • CT ratio and metering point
  • Whether the utility pulse output is available for synchronisation

No additional information.

Need a quotation for this product?

Send us your specification and we route the enquiry straight to the manufacturer’s export team. Requesting a quotation through IndusGrove is free.

Independent listing. IndusGrove is an independent B2B directory for the power, electrical and renewable energy industry. We are not a distributor, agent or authorised reseller for the manufacturers listed here, and we do not hold stock. Manufacturer names, brand names, model numbers and trademarks are the property of their respective owners and appear here for identification and reference only.

Product information is compiled from publicly available manufacturer sources and may change without notice. Verify all specifications, ratings and compliance data with the manufacturer before purchase. Enquiries submitted through this page are referred to the manufacturer or its authorised channel.

Manufacturers may request an amendment or the removal of any listing at [email protected].