| Legal Entity | Elektromotoren und Gerätebau Barleben GmbH (EMB) |
|---|---|
| Location | Technologiepark Ostfalen, Barleben, Saxony-Anhalt, Germany |
| Site Founded | 1863, originally a sugar factory |
| Buchholz Relay Production | Continuously at Barleben since 1951 |
| Tap Changer Monitoring Relays | Since 1965 |
| Privatised | 1993, as EMB GmbH |
| Current Premises | 2009 — 4,500 m² production on an 18,000 m² site |
| Notable Acquisition | Buchholz relay production line from Končar, Croatia, 2015 |
| Core Range | Buchholz relays · SMART Buchholz relays · Monitoring relays for tap changers · Gas relays · Gas sampling and testing devices |
| Also Manufactures | Electronic ballasts for transport lighting · Customised special drives |
| Connection Options | Threaded and flanged; Chinese, former French and former British flange dimensions |
EMB — Elektromotoren und Gerätebau Barleben GmbH — manufactures protection equipment for liquid-filled transformers and tap changers from Barleben, Saxony-Anhalt. Buchholz relays have been built on this site continuously since 1951, one of the longest unbroken production runs for the device anywhere.
The site was founded in 1863 as a sugar factory. Max Buchholz invented the relay that carries his name in 1921; the Barleben works became a branch of Siemens Magdeburg in 1943, passed through the East German state combines as VEB Elektromotorenwerk Barleben and its successors, and began manufacturing Buchholz relays in 1951. Monitoring relays for tap changers followed in 1965. The company was privatised in 1993 under its present name.
In 2009 EMB moved into purpose-built premises in the Technologiepark Ostfalen at Barleben — 4,500 m² of production floor on an 18,000 m² site. In 2015 it acquired the Buchholz relay production line from Končar, Croatia, consolidating a further European range into Barleben.
Beyond transformer protection, EMB manufactures electronic ballasts for passenger and freight transport lighting and customised special drives for machinery, plant engineering, transport and power engineering.
Buchholz relays are bought twice: once when a transformer is built, and again — often decades later — when the relay is replaced. On a replacement the electrical specification is rarely the constraint; whether the device fits the pipe already welded to the transformer is. Ordering a functionally correct relay in the wrong pattern means new pipework, a longer outage and an oil handling exercise nobody budgeted for.
EMB’s breadth of connection types and flange standards exists for exactly that reason. Send a photograph of the existing relay and its nameplate, the pipe nominal diameter and the flange pattern with your enquiry and the correct device can be identified from it.